Dieppe Trails North West Trail Summerside Baywalk
Lily Lake Trail Northwest Trail (Phases 1-3) • 2009-2014 PDF Version
Sackville Waterfowl Park
BDA worked with the City of Moncton between 2009 and 2014 to design a trail system that connects the north end of Moncton with the downtown. The project was broken out in three phases. The first phase of he trail follows an existing power line corridor before meeting Killam drive. The third phase of the project finished the link along Killam drive between Jonathan Avenue and Centennial Park. Phase 2 connected Centennial Park to Vaughan Harvey along an old rail bed. Several seating areas were placed in various location of the trail complete with shade shelters, benches, and plant material.

BDA Landscape Architects ● 828 Main Street, Sussex, NB E4E 2M5 ●  506-433-5821info@bdaltd.ca