Sackville Waterfowl Park
BDA were retained by the Town of Sackville to prepare a construction drawing package and obtain permits to replace the existing boardwalk in the Sackville Waterfowl Park. The new boardwalk and trail alignment follows the existing alignment to minimize wetland disturbance. Following construction of Phase I of boardwalk replacement, an evaluation of remaining boardwalk sections was completed to determine future phasing and costing. BDA completed construction drawings and tender (under budget) for Phase II and Phase III which were constructed in 2014.